Henan Sangong Lihua Industry Co., Ltd.
Products
Contact Us
  • Contact Person : Ms. LH SG
  • Company Name : Henan Sangong Lihua Industry Co., Ltd.
  • Tel : 0086-0371-63820123
  • Fax : 0086-0371-63820123
  • Address : Henan,Zhengzhou,NO.11 Cuihua Road,Zhengzhou City,Henan Province,China
  • Country/Region : China
  • Zip : 450000

SGLH pp interlockig sports flooring 1112

SGLH pp interlockig sports flooring 1112
Product Detailed
Related Categories:Other Flooring
No residual moisture or smell left inside build once, use many Non-fade interlocking sports flooring Long lifetime 8~12 year

Product name

suspend interlocking flooring

Material

100% polypropylene

Size:

247*247*13mm/304.8*304.8*13mm

Feature

strong resilience

Warranty

8~12 years

Usage

Basketball, Futsal, Tennis, Hockey, Gym, Kindergarten

Load Capacity ,KG

≥1634.4

Rebound Rate

97%

Shock Absorption

55%

Coefficient of sliding friction

0.52

High Temperature:

70°C,can not be distorted and deformed in 24 hours

Low Temperature

-40°C,after 24 hours in low temperature, then immediately do free drop test from 1 meter high No fracture and damage

Advantage

1) Continuous remove 10,000 times

2)Long service life

3) Resilient surface for high impact sports

4) Extreme durability and consistent performance for life of court

5) Anti Slip Surface

6)Anti- bacterial

7) Easy to install (no adhesive required)

8) Easy access to base beneath

9) Easy to maintenance

10)Special design for water drainage

11) Special manufacturing process reduces smell

12) Recyclable

13)Fashionable

Applications

1.basketball sport court, volleyball sport court, tennis sport court, futsal sport court, handball sport court, indoor gymnasium, Shipping: for ship deck; Garden, Terrace, Villa courtyard; ole playground reformation, garage

Installation

1. It can be installed directly over the concrete, asphalt or any other hard and flat surface, there are edgings for the finished courts, screws are needed, and you should use the paper knife or circular saw to cut the tiles to make a perfect fit.

2. The construction ground must be kept clean, lasting dry and without any crack. The rate of moisture in the concrete ground mustn't surpass 2.5% and the rate of moisture in the gypsum floor mustn't surpass 0.5%.

3. The floors must be spread out and laid on the ground for more than 24 hours and the temperature at the scene mustn't be lower than 15°C. The floors are installed after reduction.

Maintenance

1. Don’t wear the nail shoes, High-heeled shoes.

2. After snow, Don’t let snow leave on it longtime, Try to clearing the snow immediately

3. Often wash, or mopping the floor.

4. Don’t knock the floor by sharp object.

5. Don’t pour Sulfuric acid and hydrochloric to the floor.

SGLH pp interlockig sports flooring 1112



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.